Language Selection

Get healthy now with MedBeds!
Click here to book your session

Protect your whole family with Orgo-Life® Quantum MedBed Energy Technology® devices.

Advertising by Adpathway

         

 Advertising by Adpathway

GHMC begins 18 link road works connecting major thoroughfares

6 days ago 5

PROTECT YOURSELF with Orgo-Life® QUANTUM TECHNOLOGY

Orgo-Life the new way to the future

  Advertising by Adpathway

Greater Hyderabad Municipal Corporation (GHMC) officials informed that road works have already been launched where right of way exists, and at other locations, property acquisition is underway. The image is used for representative purposes only.

Greater Hyderabad Municipal Corporation (GHMC) officials informed that road works have already been launched where right of way exists, and at other locations, property acquisition is underway. The image is used for representative purposes only.

The Greater Hyderabad Municipal Corporation (GHMC) has started the third phase of link roads at various locations in the city, taking forward the project first conceptualised more than six years ago.

Link roads are small stretches of road development, which would connect two existing major thoroughfares, thus providing alternative stretches for arterial roads in the city, thereby reducing traffic chaos.

Slip roads as a go-around of major junctions

The roads were first planned in 2019 by the Town Planning wing of the GHMC, along with slip roads-- which are laid as a go-around of major junctions where traffic is heavy. During the initial two phases of the project, a total 31 stretches were completed, which not only eased the traffic flow, but also opened the gates for real estate on the developed roads.

The proposed link roads in Rajendranagar Zone

Name of the roadRoad length (km)
Bairagiguda to Narsingi0.85
ORR Service road to Chevella road via Kismatpur5.5
Kismatpur to R&B Road Prestige Villas2.05
Dargah to LV Prasad Eye Institute0.85
Farmaish Hotel to Taramati Baradari2.5
Bapughat Bridge to P&T Colony, east to Esa river2.1

18 stretches under Phase-III

In Phase-III, a total 18 stretches are being envisaged for completion across three zones, Shamshabad, Rajendranagar and Khairatabad. Of these, a total 11 stretches are planned in Shamshabad Zone alone, which has been added to GHMC during the merger and de-merger of the erstwhile GHMC area.

The proposed link roads in Khairatabad Zone

Name of the roadRoad length (km)
Greenland Junction to Necklace Road Junction1.6
Necklace Road railway station to Patigadda 1

Longest stretch

The longest stretch too would be laid in Shamshabad, from Gollapally Junction to the Outer Ring Road (ORR) service road at Pedda Golconda, covering a total seven kilometres.

The other stretches in Shamshabad, which are to be connected, include Thorrur-Nagarjuna Sagar Road (1.6 km), Injapur-Munganur Road (2 km), Badangpet-Nadargul main road to Nadargul road (2.6 km), Badangpet Main road to Thurkayamjal via Ramalayam of Nadargul (3.8 km), Mallapur Cross road to Kurmalguda (3.2 km), Kurmalguda to Nadargul (3.3 km), RCI X road to Srishailam Highway (2.6 km), Shamshabad Railway Crossing to Dharmagiri Road (5 km), Shamshabad Bus Stop to Rallaguda road (4 km), and Dondupally junction to ORR service road.

Road stretches in Rajendranagar

In Rajendranagar, the stretches are, Bandlaguda to Narsingi (0.85 km), ORR Service road to Chevella road via Kismathpur (5.5 km), Kismathpur to R&B road near Prestige villas (2.05 km), Dargah to LV Prasad Eye Institute (0.85 km), Farmaish Hotel to Taramati & Bharadari via Kendriya Vihar apartments including the new bridge on Musi (2.5 km), and Bapughat Bridge to P&T Colony East Side of Esa River (2.1 km).

Name of the roadRoad length (in km)
Thorrur to Nagarjunasagar road1.6
Injapur road to Munugur road2
Badangpet-Nadargul main road to Nadargul road2.6
Badangpet to Turkayamjal via Ramalayam Nadargul3.8
Mallapur Crossroad to Kurmlaguda3.2
Kurmalguda to Nadargul3.3
RCI X road to Airport Hotel of Srisailam Highway2.6
Gollapally NH jn to ORR service road7
Shamshabad railway crossing to Dharmagiri Road5
Shamshabad bus stop to Oasis International School4
NH 44 Dondupally Jn to ORR Service road3

Khairatabad

Khairatabad has one major stretch connecting Lok Bhavan Road to R&B guest house and a link road from Begumpet Railway Station. The link road stretches will be laid from Greenalands junction to Necklace Road (1.6 km), and Necklace Railway Station to Patigadda (Parallel to railway track) via Park Hotel covering one kilometre.

Officials informed that works have already been launched where right of way exists, and at other locations, property acquisition is underway.

Published - June 12, 2026 01:11 pm IST

Read Entire Article

         

        

Start the new Vibrations with a Medbed Franchise today!  

Protect your whole family with Quantum Orgo-Life® devices

  Advertising by Adpathway